TradeOff Tool:s A New Path To Modeling And Planning For Your Data Center

TradeOff Tool:s A New Path To Modeling And Planning For Your Data Center

TradeOff Tool:s A New Path To Modeling And Planning For Your Data Center

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Data Center Research & Strategy August 2025

Property of Schneider Electric

Topics

01 02 03 04 What are TradeOff Tools?

How should you use them?

What TradeOff tools are available?

What other assets are available?

Property of Schneider Electric | Page 2

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Simple, interactive calculators backed by science to explore “what if” scenarios to achieve optimal data center and edge infrastructure designs. Continuously updated, rigorously tested.

Property of Schneider Electric | Page 3

We create useful tools that explore solutions to difficult problems

Reach the tool library: Free to use

01 TRUSTED In-depth analysis of complex data center interactions

02 SIMPLE Intuitive, one-screen, standardized user interface

03 RELEVANT

05 OPTIMIZED

04 COMPARABLE

Addresses commonly faced challenges decisions

Helps quantify and justify business decisions

Use on PCs or tablets for best user experience

Data center lifecycle CO2e calculator

DCIM planning and modeling value calculator

Data center capital cost calculator

01WHAT ARE TRADEOFF TOOLS?

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/

02 HOW SHOULD YOU USE THEM?

Property of Schneider Electric | Page 4

Where do tools come in?

1 Identify Basic

requirements

Early in planning, when defining requirements for your data center/edge project.

2 Develop System

architecture

3 Adjust For constraints & preferences

4 Generate Specification

5 Design Detailed

construction design

BUILD

PROJECT PARAMETERS

CONCEPT

Capacity Budget Growth plan Criticality Density Efficiency Sustainability

03WHAT TRADEOFF TOOLS ARE AVAILABLE?

Over 30 distinct tools, matching your most

pressing data center design considerations

ABBREVIATED LIST • Data center capital cost calculator

• Data center lifecycle CO2e calculator

• Micro data center lifecycle CO2e calculator

• DCIM monitoring value calculator for distributed IT

• DCIM planning and modeling value calculator

• Site electricity emission factor calculator

• Edge UPS fleet management comparison calculator

• Three phase UPS efficiency comparison calculator

• Three phase UPS modernization calculator

• Single phase UPS efficiency comparison calculator

• eConversion vs. double conversion calculator

• Data center power sizing calculator

• Data center efficiency & PUE calculator

• Data center carbon footprint calculator

• Lithium-ion vs. VRLA UPS battery TCO calculator

Property of Schneider Electric | Page 5

Navigating TradeOff Tools A few simple principles to make life easier

Language support Reset to complete a new scenario

Property of Schneider Electric | Page 6

Supported browsers are: Save results as a PDF

Chrome, Edge, Firefox, and Safari

It’s possible to view the tools in your local language by either right clicking and selecting “Translate to …” or choosing the “Translate” option within your browser

To reset a tool to defaults, reload the page by right clicking and choosing the “Reload” or “Refresh” option

Use your browser’s Print functionality to save your results as a PDF. We recommend you use “landscape” layout, adjust the scale so the entire tool is visible, and check the “Background graphics” box

03WHAT TRADEOFF TOOLS ARE AVAILABLE?

Go to Calculator

Data center capital cost calculator Determine the impact of physical infrastructure design choices on capital cost

Quickly set data center budget expectations (+/- 20%)

• Capacity

Decide priority among competing design parameters

Costs derived from actual configurations, quotes from 3rd party suppliers & partners

• Criticality • Budget • Growth plan • Efficiency

• Costs by subsystem • Costs by type (material, labor, install)

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Property of Schneider Electric | Page 7

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-capital-cost-calculator/

Single-phase UPS efficiency comparison calculator

Determine impact of single-phase UPS efficiencies on energy costs and carbon footprint

Compare 2 single-phase UPS systems

Assess Schneider Electric UPSs (measured data) or define your own UPS

See efficiency, electricity cost, and carbon as a function of IT load

• Efficiency • Electricity cost • Carbon footprint

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 8

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/single-phase-ups-efficiency-comparison-calculator.jsp

Go to Calculator

Three-phase UPS efficiency comparison calculator

Gauge the impact of 3-phase UPS on energy costs and carbon footprint

Compare 2 three phase UPS systems

Assess Schneider Electric UPSs (measured data) or define your own UPS

Demonstrate how redundancy impacts the efficiency curve

• Efficiency • Electricity cost • Carbon footprint

See efficiency, electricity cost, and carbon as a function of IT load

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Property of Schneider Electric | Page 9

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/three-phase-ups-efficiency-comparison-calculator.jsp

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

DCIM monitoring value calculator for distributed IT

Estimate the potential value of DCIM monitoring & alarming for distributed IT (EcoStruxureTM IT Expert)

Provide a framework for estimating the value of DCIM monitoring and alarming functions, based on user-defined settings

See where value comes from

Calculate ROI with subscription-based DCIM

See cashflow over a 5-year period and side-by-side breakdown of DCIM value and savings

• Downtime reduction

• Staff optimization / re-allocation

• Security & environmental incident reduction

Property of Schneider Electric | Page 10

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/dcim-monitoring-value-calculator-for-distributed-it.jsp

DCIM planning and modeling value calculator

Estimate the ROI or payback of DCIM planning and modeling software (EcoStruxure IT Advisor)

Property of Schneider Electric |Page 11

Provide a framework for estimating the value of DCIM planning and modeling functions

See where value comes from

Understand ROI or payback period

See cashflow over 5-year period

• Staff optimization / re-allocation

• Energy and carbon savings

• Capex avoidance

• Downtime reduction

• Based on user-defined thresholds and settings

Go to Calculator

• Perpetual-license DCIM

• Subscription-based DCIM

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/dcim-planning-and-modeling-value-calculator.jsp

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Single-phase Li-ion vs. VRLA UPS TCO calculator

Compare the total cost of ownership (TCO) between single-phase Li-ion and VRLA UPSs

See where and when SE or other Li-ion UPSs deliver savings over VRLA, including battery replacements, energy efficiency, and rack space

Visualize your total cost over any period up to 10 years with dynamic graphs and results table

Compare carbon emissions impact, from use-phase electricity consumption differences

See side-by-side breakdown of costs and savings

Property of Schneider Electric | Page 12

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/single-phase-li-ion-vs-vrla-ups-tco-calculator.jsp

Edge UPS fleet management comparison calculator

Compare costs of managing your own distributed UPSs vs. utilizing a 3rd party

Compare costs for managing a distributed UPS fleet

Assess annual costs & downtime for a user-defined asset age distribution

Demonstrate how key variables impact optimal approach

• Transportation & parts cost

• Staff cost

• Downtime cost

• Vendor / partner service cost

Go to Calculator

• Staff count, time allocation, & cost

• Downtime events, recovery time, & cost of downtime

• Frequency of events requiring dispatch of service personnel

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Property of Schneider Electric | Page 13

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/edge-ups-fleet-management-comparison-calculator.jsp

Go to Calculator

Site electricity emission factor calculator

Understand the impact of electricity source mix on carbon emissions

Learn how electricity mix impacts emission factor

• Weighted source mix

Benchmark your electricity emission factor against other sources

See how sources contribute to:

• Scope 2 breakdown

• Emission factor by scope

• Scope 1 breakdown

• Scope 3 breakdown

• Utility-provided electricity • Onsite-generated electricity • Renewable contracts

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Property of Schneider Electric | Page 14

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/site-electricity-emission-factor-calculator/

Prefabricated data center service contract ROI calculator

Estimate the value of monitoring & maintenance for prefabricated data centers

Provide a framework for estimating the value of monitoring and maintenance service contracts for prefabricated data centers

See where value comes from

Calculate return on investment (ROI)

See cashflow over 5-year period

• Downtime reduction

• Energy reduction

• Staff optimization / re-allocation

• Based on user-defined thresholds and settings

Compare energy- related CO2e with and without a service contract

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 15

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/prefabricated-data-center-service-contract-roi-calculator/

Prefabricated vs. traditional cost calculator

Compare financials: Key cost drivers:

• Cooling architecture

• Rack density

• Placement of prefab modules

• Build vs. lease of core & shell

• Equipment cost

• Design installation cost

• Space cost

Determine impact of design attributes on cost of prefabricated vs. traditional data centers

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 16

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/prefabricated-vs-traditional-data-center-cost-calculator/

eConversion vs. double conversion calculator

Demonstrate impact of operating a UPS in eConversion vs double conversion mode

eConversion provides UPS loads with UL-certified Class-1 performance at reduced energy

Evaluate the impact of operating mode

With location-specific electricity rate and CO2 emissions factor, compare:

• SE UPS in eConversion mode vs. double conversion mode OR

• SE UPS in eConversion mode vs. other UPS with user-entered efficiency data

• Efficiency (%)

• Electricity (kWh)

• Carbon (tonnes)

• Cost

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 17

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/econversion-vs-double-conversion-calculator.jsp

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Data center lifecycle CO2e calculator

Quickly and easily estimate your carbon drivers to prioritize your reduction efforts

Estimate lifecycle CO2e for data centers up to 5 MW

See breakdown of emissions

Illustrate key drivers to help prioritize your carbon reduction efforts

Understand the impact of the electricity emission factor on overall lifecycle CO2e

Understand Carbon Usage Effectiveness (CUE)

• By scope

• From cradle to grave • Through the lens of a data center owner

• By lifecycle phase

• By lifecycle phase

• By system and subsystem

• By GHG scope 3 category

Property of Schneider Electric | Page 18

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-lifecycle-co2e-calculator/

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Micro data center lifecycle CO2e calculator

Quickly and easily estimate your carbon drivers to prioritize your reduction efforts

Property of Schneider Electric |Page 19

Estimate lifecycle CO2e for micro data centers up to 100 kW

See breakdown of emissions

Illustrate the key drivers to help prioritize your carbon reduction efforts

Understand the impact of the electricity emission factor on overall lifecycle CO2e

Understand Carbon Usage Effectiveness (CUE)

• By scope

• By lifecycle phase

• By system and subsystem

• By GHG scope 3 category

• From cradle to grave

• Through the lens of a micro data center owner

Go to Calculator

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/micro-data-center-lifecycle-co2e-calculator/

Data center efficiency & PUE calculator

Determine impact of alternative power and cooling approaches on energy cost

Estimate annualized data center efficiency of new or existing data center

See the efficiency curve of the data center

Determine efficiency impact of key design decisions

• Power usage effectiveness (PUE)

• Power consumption by subsystem

• Energy cost breakdown

• Redundancy

• Cooling / power architecture

• Percent load

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 20

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-efficiency-and-pue-calculator/

Go to Calculator

Three phase UPS modernization calculator

Estimate the opex and carbon savings of replacing an aging 3-phase UPS with a new UPS

Compare aging vs. new 3-PH UPS systems

Assess cumulative costs and NPV over 10-year life

Demonstrate implications of operating an aging, less efficient UPS

• Electricity cost

• Maintenance contract cost

• Battery replacement cost

• Spare parts replacement cost

• Carbon footprint

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Property of Schneider Electric | Page 21

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/three-phase-ups-modernization-calculator/

Data center power sizing calculator

Determine impact of server & storage configurations on IT capacity and required input power

Define basic characteristics of a data center’s IT load

Understand the impact of GPUs for AI / HPC

Estimate data center IT load capacity

• Server quantity & mix • Mainframes • Storage

Calculate how much utility power is required to support IT load

• PUE

Demonstrate allocation on total power requirement

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 22

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/data-center-power-sizing-calculator.jsp

Data center carbon footprint calculator

Determine impact of changes in data center efficiency on energy costs and carbon footprint

Illustrate how data center changes impact carbon emissions

Determine savings in electricity as PUE improves

Estimate equivalent number of cars removed from road

• Location • Efficiency (PUE) • Load (kW)

Demonstrate 15-year cost and carbon savings

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 23

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-carbon-footprint-comparison-calculator/

3-Phase Lithium-ion vs. VRLA UPS battery TCO calculator

Compare financials: Key drivers of TCO:

• Replacement period for each energy storage type

• Runtime

• Cumulative cost summary and chart illustrating cross-over point

• Breakdown of TCO costs

View TCO impact of lithium-ion vs. VRLA batteries for energy storage of static UPS

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 24

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/lithium-ion-vs-vrla-ups-battery-tco-calculator/

Data center build vs. colocation TCO calculator

Determine impact of data center attributes and pricing model on TCO, cross-over point, & cash flow

Impact of data center attributes and pricing model on TCO

Compare financials:

Key assumptions:

• TCO

• Break-even (years)

• Cash flow by year

• % un-scalable infrastructure

• Maintenance, staffing

• Colocation setup/install

• Remote hands for colocation

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 25

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-build-vs-colocation-tco-calculator/

Data center & edge global energy forecast

Demonstrate how the edge will be a growing contributor to IT energy consumption

Provide scenarios on future energy consumption

Demonstrate the importance of implementing best practices at the edge

Leveraged 2 studies

• Core data centers

• Distributed IT

• Internal SE study “The Long-Term Impact of IT on Electricity Consumption”, Oct 2018

• IDC Data Capacity Analysis, 2019

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 26

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-and-edge-global-energy-forecast/

Data center temperature rise calculator

Understand how temperatures rise when power and cooling is lost

Examine how data center design can affect temperature when power and cooling is lost

Examine how to mitigate temperature rise when power and cooling is lost

Examine when best to switch back to primary power after power loss

Model a range of data center architectures, cooling, and power characteristics

Provide industry standard alerts and recommendations

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 27

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-temperature-rise-after-primary-power-loss-calculator/

Data center capacity & growth planning calculator

Determine impact of power and cooling technology and growth plan strategies on design parameters

Show how uncertainty of IT growth plan impacts costs

Demonstrate how scaled build- out reduces data center TCO. Key factors include:

Compare PUE over data center life

Compare run-rate and cash flow analysis

• IT load profile

• Step size

• Redundancy

• Power & cooling architecture

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 28

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-capacity-and-growth-planning-calculator/

Data center InRowTM cooling containment selector

Generate optimal containment configuration

Identify dimensions and layouts that limit configuration possibilities

• Uncontained

• Hot aisle containment

• Rack air containment

• Rack air containment with front containment

Determine impact of preferences and constraints on the recommended containment approach

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 29

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-inrow-cooling-containment-selector/

Server carbon & energy allocation calculator

View impact of efficiency, load characteristics, & location on carbon and energy allocation for IT users

Assign carbon & energy costs to IT users, based on data center attributes:

See annual energy and carbon allocations on a per-server basis, driven by:

• Efficiency (PUE) • IT load • Location

Illustrate15 year allocations

• Servers • Networking • Physical infrastructure• Storage

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 30

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-server-carbon-and-energy-allocation-calculator/

Cooling economizer mode PUE calculator

Determine impact of geography and cooling characteristics on PUE, energy, and CO2 emissions

Compare common cooling architectures

Determine optimal cooling economizer approach based on:

• PUE

• Energy cost

• Carbon

• Full & partial economizer hours

• Climate (ASHRAE bin data)

• Data center load

• IT operating environment (temperature & humidity)

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 31

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-cooling-economizer-mode-pue-calculator/

Rack power architecture efficiency calculator

Compare performance of conventional PSU architecture with 12V & 48V rack-level PSU architectures:

Key drivers:

• Efficiency

• Losses

• Energy cost

Compare conventional ITE-level PSU architectures with centralized rack-level PSU architectures

• PSU oversizing

• PSU redundancy

• Component efficiencies

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 32

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-rack-power-architecture-efficiency-calculator/

Data center virtualization savings calculator

Determine impact of server virtualization and data center design choices on energy & space savings

Illustrate energy savings resulting from server virtualization

Compare pre- and post- virtualization

Demonstrate where energy savings comes from:

• % energy savings

• Annual electric bill

• Efficiency (PUE)

• Space required

• Entire data center

• Physical infrastructure

• Total IT

• Servers

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 33

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-virtualization-energy-savings-calculator/

Data center IT pod sizing calculator

Results based on: Calculated results include:

• Input voltage

• Input break size

• Density per rack

Understand the electrical and physical attributes of an IT pod

• Maximum pod capacity

• Rack count

• Branch breaker recommendation

• Number of breakers & positions needed

• Footprint required

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 34

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-it-pod-sizing-calculator/

Data center cooling architecture calculator

Provide the user with the optimal cooling architecture based on key data center attributes, preferences, and constraints

Recommended cooling architectures include:

Determine optimal cooling architecture based on:

• Heat removal method

• Economizer mode

• Indoor unit location

• Air distribution

• Data center capacity and power density

• The containment and floor type

• Financial factors analyzed

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 35

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-cooling-architecture-comparison-calculator/

Traditional vs. OCP capital cost calculator

Compare financials: Key cost drivers:

• Capital cost summary

• Comparison at subsystem level to highlight where cost differences occur

View capital cost comparison and key drivers between traditional and Open Compute power architectures

• Data center load mix of traditional & OCP

• Traditional server power supply oversizing and cost per watt

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 36

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/traditional-vs-open-compute-data-center-capital-cost-calculator/

Flywheel vs. battery carbon footprint calculator

View carbon impact of flywheels vs. VRLA batteries for energy storage of static UPSs

Compare carbon footprint over entire lifecycle

In most countries, batteries are “greener”

Key drivers

• Location (energy source) • Battery service life

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 37

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/flywheel-vs-battery-ups-carbon-footprint-calculator/

InRowTM ancillary IT equipment cooling calculator

Determine impact of IT, cooling, & room characteristics on ability for row-based cooling to support ancillary IT loads

Determine if additional cooling is required or if the existing InRow cooling is sufficient, based on:

Ancillary IT = IT equipment not arranged in rows, such as:

• IT parameters

• Cooling parameters

• Room characteristics

• Tape libraries

• Storage equipment

• Networking gear

• Power distribution equipment

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 38

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-inrow-ancillary-it-equipment-cooling-calculator/

Data center AC vs. DC efficiency calculator

Compare energy efficiency of four different power distribution architectures

Demonstrate how 415 V AC and 380 V DC have virtually same efficiency

• Legacy 208 V AC

• Best practice 208 V AC

• 415 V AC

• 380 V DC

View impact of data center efficiency of various AC and DC power distribution architectures

TradeOff Tools A NEW PATH TO MODELING AND PLANNING FOR YOUR DATA CENTER

Go to Calculator

Property of Schneider Electric | Page 39

https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/data-center-ac-vs-dc-efficiency-calculator/

04 WHAT OTHER ASSETS ARE AVAILABLE?

Property of Schneider Electric | Page 40

Resources to guide your project decisions

01 White papers 02 Blogs

03 Executive reports 04 Infographics

05 Videos/ podcasts 06 Reference

designs

Key takeaways

TradeOff Tools are simple, interactive tools, based on data and science, that make it easy to vary parameters, experiment with “what if” scenarios and make tradeoffs during data center planning

Used early in the planning process, TradeOff Tools help avoid planning roadblocks by making informed and accurate decisions

TradeOff Tools help show quantifiable, tangible benefits of implementing certain technologies and justify project decisions

01 What are TradeOff Tools? 02 When should

they be used? 03 How do they help in planning a data center?

Contact Us

Data Center Research & Strategy Email us at: dcsc@se.com

Contact us with questions or comments with

TradeOff Tools, white papers, or other assets

TradeOff Tools available

White papers available

Try online now

Download now

https://www.se.com/ww/en/work/solutions/for-business/data-centers-and-networks/trade-off-tools/ https://www.se.com/us/en/download/doc-group-type/120247931374-White+Paper/?sortByField=Document_Date_New&keyword=SPD_

Public

se.com

https://www.se.com/ww/en/ https://www.facebook.com/SchneiderElectric https://www.linkedin.com/company/schneider-electric/ https://www.youtube.com/user/SchneiderCorporate https://twitter.com/SchneiderElec https://www.instagram.com/schneiderelectric/ https://blog.se.com/

TradeOff Tools Slide Number 2 We create useful tools that explore solutions to difficult problems� Slide Number 4 Over 30 distinct tools, �matching your most �pressing data center �design considerations Navigating TradeOff Tools Data center capital cost calculator Single-phase UPS efficiency comparison calculator Three-phase UPS efficiency comparison calculator Slide Number 10 DCIM planning and modeling value calculator�� Slide Number 12 Edge UPS fleet management comparison calculator�� Site electricity emission factor calculator Prefabricated data center service contract ROI calculator��� Prefabricated vs. traditional cost calculator Slide Number 17 Slide Number 18 Micro data center lifecycle CO2e calculator� Data center efficiency & PUE calculator ��� Slide Number 21 Data center power sizing calculator Data center carbon footprint calculator 3-Phase Lithium-ion vs. VRLA UPS battery TCO calculator Slide Number 25 Data center & edge global energy forecast��� Data center temperature rise calculator Slide Number 28 Data center InRowTM cooling containment selector Server carbon & energy allocation calculator Slide Number 31 Rack power architecture efficiency calculator Slide Number 33 Data center IT pod sizing calculator Slide Number 35 Traditional vs. OCP capital cost calculator Flywheel vs. battery carbon footprint calculator Slide Number 38 Data center AC vs. DC efficiency calculator Slide Number 40 Slide Number 41 Contact Us Closing slide – please use one in your presentation


Item Type: pdf