A guide to more sustainable, efficient, resilient, and adaptable facilities
http://www.se.com/modernization
Table of contents
Life Is On | Schneider Electric
Sustainable Modernized Data Centers
Sustainable Modernized Data Centers
Life Is On | Schneider Electric
Life Is On | Schneider Electric
Data is an ever-growing global need, maturing and changing as industries and everyday tasks are made easier, faster, or more convenient through connected devices. Data centers must rise to meet those needs with improved sustainability, efficiency, resiliency, and adaptability.
As data usage skyrockets, data centers consume more power. The electricity our facilities require to keep up with demand must be cleaner and greener in the face of the global climate crisis. Eco-friendly modernization is essential to responsibly manage the power consumption that comes with an increasing number of hyperscale data centers. Through high-level integrated architecture, intelligent power management, building management, and AI-based data center infrastructure management solutions, you can ensure your data center is ready for whatever you'll need.
Shaping your sustainable data center
Life Is On | Schneider Electric
There are thousands of data centers globally; many are decades old and can no longer meet performance requirements, are not supported by their manufacturer, or require higher maintenance costs as they age. When faced with an existing, inhabited facility, modernization must take place in isolated areas, floor by floor. These facilities often can be successfully modernized but require careful planning and partnership. Who you choose to collaborate with on your modernization journey is one of the most important decisions you’ll make.
Finding a company that’s knowledgeable about technical topics as well as value creation is essential to creating a facility built for your unique business. To smooth the planning process, that partner must also understand the needs of end users and your general contractors. Plus, having a wide network of architects, engineers, technology providers, installers, integrators, and facility management companies that understand the priorities of your building owners allows your project to be as local or as global as you need. With a broad toolbox of solutions and strategies on your side, you can tackle any project — no matter how big or small.
Picking your partner for modernization
Life Is On | Schneider Electric
Modernization Explained
Life Is On | Schneider Electric
Life Is On | Schneider Electric
Though there are many ways to take on modernization, data centers ultimately need to be modified to accommodate your business goals. Having an older data center may be stopping you from meeting your targets. Common issues that need to be resolved include lack of space, inefficient cooling, or even larger, facility-wide issues like an electrical infrastructure that isn’t flexible enough to accommodate rapid growth. These problems often result in a higher risk of power failure.
How modernization helps you
Life Is On | Schneider Electric
The benefits of your modernized facility
59% of total business interruption losses are due to fires and explosions.*
*Allianz Global Corporate & Specialt **Source: Factory Mutual Insurance Group; FM global ***Source: Factory Mutual Insurance Group; Emerson estimate
Power distribution failure impacts every part of your facility, not just your data centers. There are significant, measureable losses that modernization can help prevent.
The cost of not modernizing
56% of all electrical fires are due to lack of proper maintenance.**
25 million electrical motors fail each year.***
Life Is On | Schneider Electric
Life Is On | Schneider Electric
Modernized data centers can be more sustainable, efficient, and digitally connected, helping you stay ahead of the three trends driving innovation across the industry.
*Source: Internal Survey on 1,500 customers in eight countries. Repaired and serviced is the main solution expectation in term of circularity-related topics **Source: McKinsey June 2020 Resetting capital spending in the wake of Covid 19 ***Source: International Energy Forum
Up to average CapEx cut in 2020 by our customers looking to improve operations to free up cash.**
25% Up to
of our customers consider it crucial to have a product repaired and serviced for longer lifetime.*
70% digital trends which will transform the energy industry: Energy decentralization, the Internet of Energy, and Data Everywhere.***
03
Sustainability Efficiency Digitalization
Life Is On | Schneider Electric
When it comes to data center modernization, you’ll have many choices to make. Depending on your unique situation, you may consider:
• Upgrading your entire facility
• Consolidating your small server rooms and wiring closets into a larger data center
• Designing a completely new build-out
• Integrating new capacity through prefabricated power and cooling modules
• Offloading certain applications and platforms to private or public clouds
• Migrating to a colocation facility
In particular, how much of your data center operation remains in-house and how much you outsource to the cloud and/or colocation facilities is critical. For example, over a 10-year period, it may make sense to upgrade or build a data center as part of your facility, but that can be influenced by your sensitivity to cash flow, cash crossover point, deployment time frame, data center life expectancy, regulatory requirements, and other strategic factors.
Your options for modernization
Life Is On | Schneider Electric
Life Is On | Schneider Electric
To help you envision which scenario might work best for you, it’s important to focus on the physical infrastructure aspects of data center modernization, rather than IT infrastructure (i.e., servers, switches, storage). Physical data center infrastructure includes:
• Power systems, such as uninterruptible power supplies (UPSs), power distribution units, overload protection, isolation transformers, automatic transfer switches, switchgear, and generators to provide uninterrupted, conditioned, clean power to critical loads
• Precision cooling systems that provide an optimal environment by regulating temperature and humidity (including both chillers and precision air handlers and air conditioners)
• Building and power management systems that give you more insights into your facility
• Programmable logic controllers
What equipment matters for modernization?
Life Is On | Schneider Electric
More Sustainable, Efficient, and Digital
Life Is On | Schneider Electric
Life Is On | Schneider Electric
Become more sustainable, efficient, and digital Sustainability Efficiency Digitalization
Modernizing your data center’s physical infrastructure plays a major role in making the path to net zero clearer. Whether you refurbish, retrofit, or completely replace your existing equipment, you’ll gain more visibility into your energy management data through digital connectivity. This lets you better monitor your energy consumption and perform condition-based maintenance, extending the life of your assets and saving time by eliminating unneeded service visits.
Refreshing Enhancing existing equipment with improved connectivity and sensors can lengthen the lifetime of your assets and let you optimize your power consumption.
Retrofitting Upgrading the active components of your existing electrical equipment reduces material waste throughout your modernization process. Plus, our end-of-life program for SF
6 -based
equipment ensures sustainable waste disposal. Renewing Entirely replacing your equipment with connected solutions lets you optimize and maximize your data center’s performance and availability on every level.
Explore recycling options
When you upgrade, we’ll provide safe and sustainable end-of-life options for your obsolete equipment.
https://www.apc.com/nl/en/who-we-are/sustainability/recycling-options.jsp
Life Is On | Schneider Electric
Become more sustainable, efficient, and digital Sustainability Efficiency Digitalization
Downtime risks and excessive maintenance costs ultimately have a huge impact on your facility’s efficiency. Modernizing to a modular design for better flexibility, using lithium- ion batteries for your UPS systems, and incorporating SF
6 -free switchgear into your
power system can help boost your uptime.
Because every facility is unique, our online tools can help you decide when the time is right for you to modernize.
UPS modernization calculator
Find out which state-of-the-art UPS is right for your needs.
Modernization trade-off tool
Weigh your options and decide when the right time to upgrade is.
Lithium-ion vs. VRLA battery calculator
Discover the cost savings in switching from VRLA to lithium- ion batteries.
eConversion vs. double conversion calculator
Compare which UPS system is best for your facility’s goals.
https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/three-phase-ups-efficiency-comparison-calculator/ https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/three-phase-ups-efficiency-comparison-calculator/ https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/three-phase-ups-modernization-calculator/ https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/three-phase-ups-modernization-calculator/ https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/lithium-ion-vs-vrla-ups-battery-tco-calculator/?_ga=2.39520549.740736912.1562171831-937334690.1561557611) https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/lithium-ion-vs-vrla-ups-battery-tco-calculator/?_ga=2.39520549.740736912.1562171831-937334690.1561557611) https://www.se.com/ww/en/work/solutions/system/s1/data-center-and-network-systems/trade-off-tools/lithium-ion-vs-vrla-ups-battery-tco-calculator/?_ga=2.39520549.740736912.1562171831-937334690.1561557611) https://tools.dev.se.com/en/econversion-vs-double-conversion-calculator/ https://tools.dev.se.com/en/econversion-vs-double-conversion-calculator/ https://tools.dev.se.com/en/econversion-vs-double-conversion-calculator/
Life Is On | Schneider Electric
Become more sustainable, efficient, and digital Sustainability Efficiency Digitalization
The power of data is at the heart of a modern facility. The more connected devices within it, the more possibilities exist for optimization, adaptability, and efficiency.
Digitalization plays a foundational role in active energy management and efficient facility operations. For existing data centers, this can be done by retrofitting electrical systems with smart devices in combination with energy and power management, allowing you to:
• Gain better insight into your electrical systems with remote monitoring
• Avoid time wasted on unneeded service visits with condition-based maintenance
• Improve the lifecycle of your assets with digitally connected sensors
Life Is On | Schneider Electric
Is Modernization Right for You?
Life Is On | Schneider Electric
Life Is On | Schneider Electric
A data center may run out of power and cooling capacity before it runs out of available space in the IT room. When additional load is identified and easily implemented modernization options either have already been used or deemed impractical, one or more rows of racks can be added to a larger, low-density data center to increase capacity.
This type of upgrade can be achieved in a number of ways. One is to add capacity via high-density pods. These pods consist of one or more rows of racks containing high-density equipment clustered together with dedicated row-based cooling, deployed as a unit. A high-density pod resides within the borders of a larger, low-density data center and is not the same as a high-density data center, which is dedicated to supporting nothing but high-density racks.
In traditional data centers with room-based power and cooling, unmanaged high-density racks can cause destabilizing effects such as cooling inefficiency, loss of cooling redundancy, hot spots, thermal shutdown, and circuit overload. However, modern power and cooling technologies, when configured in high-density racks within the framework of a pod, offer an opportunity for dramatically increased efficiency and predictability.
Upgrading an existing data center — more cost effective than you might expect
Life Is On | Schneider Electric
Life Is On | Schneider Electric
In some cases, older existing physical infrastructure components, such as UPS and electrical distribution systems, can be upgraded by substituting old parts for new ones. In the case of a UPS, for instance, batteries, AC and DC capacitors, fan assemblies, power supply units, static switches, silicon-controlled rectifiers, and IGBTs can all be replaced, depending on vendor and model. The UPS can be restored to “like new” condition at significant cost savings when compared to buying a new system. In the case of low-voltage breaker
assemblies, old ones can be replaced with brand new ones that simply fit into the existing switchgear cell with minimal modification for 60 – 70% of the cost of replacing the entire lineup.
Extending the life of existing infrastructure
The cash crossover point for a facility module upgrade is three years (vs. an outsource scenario).
$60.0
$50.0
$40.0
$30.0
$20.0
$10.0
Outsource
Upgrade
M ill
io n
s
0 1 2 3 4 5 6 7 8 9 10 Year
Life Is On | Schneider Electric
Having a standard set of metrics and a standardized approach for assessing all of your data centers in a consolidation effort is crucial to effective migration planning. Simple, cost-effective assessment services exist to help establish your infrastructure capacities and capabilities as well as expansion for future growth, efficiencies, risks, and improvement opportunities. Assessment of physical infrastructure will reduce surprises, avoid wasteful backtracking, and assure a predictable outcome.
The common approach of trying to fit additional equipment into an existing, larger data center often results in hot spots, reliability problems, inefficiency, and running out of space. One way of avoiding these problems is to deploy a high-density pod overlay approach. This allows an existing legacy data center to transform into a high- density, high-efficiency data center during a consolidation project.
The self-contained nature of the pod means that minimal planning, design, or engineering is required to place it in any existing environment, allowing for a high degree of standardization and reduction of the deployment cycle time.
How to assess your infrastructure needs
Life Is On | Schneider Electric
Life Is On | Schneider Electric
How modernization fits your business CFOs and CIOs are often attracted to options that seem pragmatic. Investing in improvements on an already existing infrastructure appears less risky and disruptive than a radical jump to outsourcing or to the commissioning of a new data center. Beyond the cost advantages of a data center upgrade when compared to outsourcing or new build, other factors can make the upgrade scenario more attractive:
Speed of deployment
The pod and facility module approaches to upgrading are relatively speedy. If an organization places a high value on early delivery (e.g., companies that want to be first to market with new products) and are resistant to outsourcing scenarios, then the facility upgrade could be the most attractive choice.
Predictable efficiency
Both pod and facility module approaches allow data center stakeholders to specify and manufacture to publish expected efficiencies based on real measurements of the design. This predictability is attractive for businesses with a focus on energy- efficiency initiatives.
Portability
If portability is important to your stakeholders, then pods and prefabricated facility modules may make sense. Consider the example of a business that needs to deploy data center power and cooling but whose lease runs out in eight months. If its lease is not renewed, it can physically move its data center infrastructure investment with it instead of leaving it behind.
Accounting benefits
From an accounting standpoint, pods and prefabricated facility modules could be classified as “equipment” instead of a “building.” This may offer tax, insurance, and financing benefits, depending on the location of the data center and the insurance policies under contract.
Flexibility
Upgrade options are viable if you’re unsure of future growth. The flexibility of scaling and right-sizing helps to minimize risk.
Life Is On | Schneider Electric
The Next Step
Life Is On | Schneider Electric
Life Is On | Schneider Electric
To make your data center as sustainable, efficient, and resilient as possible, you must constantly evaluate and manage your operation. Understanding your vulnerable areas and implementing preventative and proactive best practices can help you mitigate losses and adapt for the future.
Sustainability, efficiency, and resiliency are emerging as key priorities for data centers as new technology emerges. Here’s why:
Optimizing your data center’s operations
70%* of our customers said having products repaired and serviced for longer lifecycles is very important.
25%* cuts in CapEx on average were made in 2020 to free up cash and improve operations – applying a TotEx approach.
56%* of electrical fires are due to lack of optimized maintenance.
98%* of a medium-voltage cubicle can be recovered during upgrades.
30%* of cost savings comes from decreased material, downtime, and sitework costs.
60 minutes* is how long it takes to get your equipment configured.
Sustainable Efficient Resilient
* Based on previous data. This is not a guarantee of future performance or performance in your particular circumstances.
Life Is On | Schneider Electric
From consulting to maintaining operations and more, our offerings enable you to provide long-term changes to increase business sustainability, efficiency, and resiliency. We’re here to help you modernize with support, training, or services. With specialization in data centers, our consulting can help you modernize by:
Maximizing safety Pinpoint potential safety risks and regulatory issues and recommend required corrective actions.
Enhancing your journey Identify infrastructure weaknesses and prevent unplanned shutdowns.
Boosting system resiliency Get expert advice on how to improve performance and availability to boost your overall power system.
Strengthening power and asset management Perform a preliminary assessment and get recommendations on how to modernize any obsolete equipment.
Starting the journey with consulting
Life Is On | Schneider Electric
Life Is On | Schneider Electric
Our consulting services give you access to our expertise, including a 360° assessment of your electrical system, so you can make sure you're operating at peak performance.
*Figures based on Schneider Electric’s customer data. This is not a guarantee of performance in your specific circumstances.
Up to Up to Up to saved in energy expenses.*
In addition, our digitalization consulting and services enable:
saved in capital expenses.*
saved in utility penalties and operating expenses.*30% 30% 10%
Energy efficiency support — 24/7
Life Is On | Schneider Electric
From essential support to the most advanced expertise, EcoStruxure™ Service Plans are a set of tailored service contracts that combine the power of our EcoStruxure platform with remote consultancy and on-site and dynamic maintenance.
Going beyond just Schneider Electric products and software, our service plans encompass your entire facility, creating value with 24/7 remote assistance and dynamic condition-based maintenance performed by our expert field services team.
EcoStruxure Service Plan
Ensuring your data center’s future health
Life Is On | Schneider Electric
https://www.se.com/ww/en/work/services/service-plan/ecostruxure-service-plan.jsp
Life Is On | Schneider Electric
Each service plan is unique to your facility’s needs. With the help of remote consultancy, on-site maintenance, and EcoStruxure Asset Advisor software that monitors, analyzes, and optimizes your critical connected products, you can:
How can services help you?
Find out how we can create a customized EcoStruxure Service Plan for your facility.
Learn more
Mitigate electrical failure up to
70%* Reduce maintenance activities up to
40%* Extend asset life by up to
25%*
*Based on previous data. This is not a guarantee of future performance or performance in your particular circumstances.
https://www.se.com/ww/en/work/services/service-plan/ecostruxure-service-plan.jsp
Schneider Electric can help you create a more sustainable and efficient future as your data center grows. By mapping a tailored modernization journey, we’ll use our diverse catalogue of solutions to help you meet your goals.
If you’re ready to see what the future of your data center looks like, connect with us.
Are you ready for Data Centers of the Future?
Life Is On | Schneider Electric
Modernization in Action
Is Modernization Right for You?
The Next StepThe Technology Behind Modernization
Modernization Explained
The Future of Data Centers
Talk to our experts
Explore your future
https://www.se.com/ww/en/work/support/country-selector/contact-us.jsp https://www.se.com/ww/en/work/campaign/modernization-services/overview.jsp
© 2022 Schneider Electric. All Rights Reserved. Life Is On | Schneider Electric and EcoStruxure are trademarks and the property of Schneider Electric SE, its subsidiaries and affiliated companies. 998-21839046
To learn more about data center modernization, visit:
Schneider Electric 35 rue Joseph Monier 92500 Rueil-Malmaison, France Tel : +33 (0)1 41 29 70 00
mailto:cybersecurity-services%40se.com?subject= https://www.facebook.com/SchneiderElectricPL/?brand_redir=248492308506194 https://www.instagram.com/schneiderelectric/ https://twitter.com/SchneiderElec https://www.youtube.com/user/SchneiderCorporate https://www.linkedin.com/company/schneider-electric/ https://blog.se.com/ http://www.se.com/modernization
Sustainable Modernized Data Centers Modernization Explained More Sustainable, Efficient, and Digital Is Modernization Right for You? TOC The Next Step Sustanability TAB Efficiency Tab digitalization Tab
Button 68: Button 69: Button 78: Button 77: Button 79: TOC - Section 1: TOC - Section 2: TOC - Section 3: TOC - Section 4: TOC - Section 5: Nav - Section 4: Page 3: Page 4: Page 5: Page 6: Page 7: Page 8: Page 9: Page 10: Page 11: Page 12: Page 13: Page 14: Page 15: Page 16: Page 17: Page 18: Page 19: Page 20: Page 21: Page 22: Page 23: Page 24: Page 25: Page 26:
Nav - Section 5: Page 3: Page 4: Page 5: Page 6: Page 7: Page 8: Page 9: Page 10: Page 11: Page 12: Page 13: Page 14: Page 15: Page 16: Page 17: Page 18: Page 19: Page 20: Page 21: Page 22: Page 23: Page 24: Page 25: Page 26:
Nav - Section 3: Page 3: Page 4: Page 5: Page 6: Page 7: Page 8: Page 9: Page 10: Page 11: Page 12: Page 13: Page 14: Page 15: Page 16: Page 17: Page 18: Page 19: Page 20: Page 21: Page 22: Page 23: Page 24: Page 25: Page 26:
Nav - Section 2: Page 3: Page 4: Page 5: Page 6: Page 7: Page 8: Page 9: Page 10: Page 11: Page 12: Page 13: Page 14: Page 15: Page 16: Page 17: Page 18: Page 19: Page 20: Page 21: Page 22: Page 23: Page 24: Page 25: Page 26:
Nav - Section 1: Page 3: Page 4: Page 5: Page 6: Page 7: Page 8: Page 9: Page 10: Page 11: Page 12: Page 13: Page 14: Page 15: Page 16: Page 17: Page 18: Page 19: Page 20: Page 21: Page 22: Page 23: Page 24: Page 25: Page 26:
Button 76: Page 3: Page 4: Page 5: Page 6: Page 7: Page 8: Page 9: Page 10: Page 11: Page 12: Page 13: Page 14: Page 15: Page 16: Page 17: Page 18: Page 19: Page 20: Page 21: Page 22: Page 23: Page 24: Page 25: Page 26:
Button 75: Page 3: Page 4: Page 5: Page 6: Page 7: Page 8: Page 9: Page 10: Page 11: Page 12: Page 13: Page 14: Page 15: Page 16: Page 17: Page 18: Page 19: Page 20: Page 21: Page 22: Page 23: Page 24: Page 25: Page 26:
Sustainability Trigger 1: Efficiency Trigger 1: Digitalization Trigger 1: Button 83: Button 84: Button 85: Button 86: Button 87: Button 88: Button 89: Button 90: Button 91: Button 28: Prev 21: Button 27: Prev 20: Prev 74: Prev 75: Button 82: Button 81: Button 80: